Return to Design Drawings  (Edit)

MROIDelayLine.DesignDrawings History

Hide minor edits - Show changes to markup

January 11, 2008, at 02:52 PM by 131.111.48.85 -
Changed line 9 from:
to:
January 09, 2008, at 05:48 PM by M Fisher -
Changed line 9 from:
to:
January 08, 2008, at 05:27 PM by M Fisher -
January 08, 2008, at 05:26 PM by M Fisher - added pipe and supports design.zip
Changed line 9 from:
  • Delay Line Pipes and Supports
to:
July 11, 2007, at 03:32 PM by 131.111.48.85 -
Changed line 8 from:
  • Trolley
to:
June 08, 2007, at 02:38 PM by 131.111.48.85 -
Changed lines 1-2 from:

Final Drawing Package (for end of contract):

to:

Final Drawing Package

For end of contract:

Changed line 7 from:

Drawings to submit for FDR:

to:

FDR Drawings

Changed lines 12-13 from:

Provisional drawings (for MRO campus test rig):

to:

Provisional drawings

Drawings for MRO campus test rig, to be submitted June 2007:

June 08, 2007, at 12:26 PM by 131.111.48.85 -
Changed line 1 from:

Drawings to submit for FDR:

to:

Final Drawing Package (for end of contract):

Changed lines 4-6 from:
  • Metrology Layout for Magdalena Ridge

Provisional drawings (for MRO campus test rig):

to:
  • Metrology Design

Drawings to submit for FDR:

  • Trolley
Added lines 9-12:
  • Metrology Layout (for Magdalena Ridge)

Provisional drawings (for MRO campus test rig):

  • Delay Line Pipes and Supports
June 08, 2007, at 12:24 PM by 131.111.48.85 -
Added lines 1-8:

Drawings to submit for FDR:

  • Trolley
  • Delay Line Pipes and Supports
  • Metrology Layout for Magdalena Ridge

Provisional drawings (for MRO campus test rig):

  • Delay Line Pipes and Supports
  • Metrology Layout
Recent Changes (All) | Edit SideBar Page last modified on January 11, 2008, at 02:52 PM Edit Page | Page History
Powered by PmWiki