Return to FDR Overheads  (Edit)

MROIDelayLine.FDROverheads History

Hide minor edits - Show changes to markup

June 08, 2007, at 01:06 PM by 131.111.48.85 -
Added line 11:
  • Proposed design changes
Added lines 18-19:
  • Performance versus Requirements summary
  • Summary of proposed changes
June 08, 2007, at 01:03 PM by 131.111.48.85 -
Added line 2:
  • Presentation Template
Added lines 12-15:
  • Tracking tests
  • Slewing tests
  • Subsystem tests
  • Vacuum integrity tests
June 08, 2007, at 12:57 PM by 131.111.48.85 -
Added lines 4-9:
  • 3d trolley drawings
  • 3d/2d pipe & support drawings
  • Metrology layout
  • Electronics block diagrams
  • Software block diagrams
  • Photographs
June 08, 2007, at 12:51 PM by 131.111.48.85 -
Changed line 3 from:
  • Design [XS/DMAW/RCB/EBS/JSY]
to:
  • Design [XS/DMAW/RCB/EBS/JSY/MF]
June 08, 2007, at 12:50 PM by 131.111.48.85 -
Added line 6:
  • Budget and schedule [DFB]
June 08, 2007, at 12:46 PM by 131.111.48.85 -
Added lines 1-5:

Powerpoint presentations for FDR (authors in brackets):

  • Requirements [DFB]
  • Design [XS/DMAW/RCB/EBS/JSY]
  • Tests [MF]
  • Conclusions [DFB]
Recent Changes (All) | Edit SideBar Page last modified on June 08, 2007, at 01:06 PM Edit Page | Page History
Powered by PmWiki