June 03, 2009, at 01:34 PM by jsy1001 -
Changed lines 1-2 from:

The set of documents required for the 2007 Final Design Review is based on MF's FDR Proposal Document.

to:

This page was used in the lead-up to the 2007 Final Design Review to summarise the status of the documents being prepared. The links point to the latest version of the documents, which in some cases have been revised since the review.

The list of FDR documents is based on MF's FDR Proposal Document.

June 03, 2009, at 12:25 PM by MF -
Changed lines 61-62 from:
 ICD: Delay line to Beam Relay system ΔINT-406-VEN-0008MF6 Nov 0728 May 2009Updated
 ICD: Delay line to BCF infrastructure (building) ΔINT-406-VEN-0009MF21 Dec 0720 May 09Updated
to:
 ICD: Delay line to Beam Relay systemINT-406-VEN-0008MF6 Nov 0728 May 2009Updated
 ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 0720 May 09Updated
May 28, 2009, at 01:54 PM by MF - Updated links to revised ICDs
Changed line 61 from:
 ICD: Delay line to Beam Relay systemINT-406-VEN-0008MF6 Nov 07-Released
to:
 ICD: Delay line to Beam Relay system ΔINT-406-VEN-0008MF6 Nov 0728 May 2009Updated
May 28, 2009, at 10:53 AM by MF -
Changed line 62 from:
 ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 0729 Apr 09Released
to:
 ICD: Delay line to BCF infrastructure (building) ΔINT-406-VEN-0009MF21 Dec 0720 May 09Updated
Changed line 65 from:
 ICD: Metrology System to BCFINT-406-VEN-0012MF6 Nov 07-Released
to:
 ICD: Metrology System to BCFINT-406-VEN-0012MF6 Nov 0729 May 2009Updated
April 30, 2009, at 02:58 PM by MF -
Changed line 62 from:
 [[Attach:InterfaceControl/INT-406-VEN-0009.pdf | ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 0729 Apr 09Released
to:
 ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 0729 Apr 09Released
April 30, 2009, at 02:57 PM by MF - Added DL to BCF ICD
Changed line 62 from:
 ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 078 Feb 08In draft
to:
 [[Attach:InterfaceControl/INT-406-VEN-0009.pdf | ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 0729 Apr 09Released
February 10, 2008, at 04:16 PM by M Fisher -
Changed line 59 from:
 | Risk and Hazard documentINT-406-VEN-0121MF22 Jan 088 Feb 08Released
to:
 Risk and Hazard documentINT-406-VEN-0121MF22 Jan 088 Feb 08Released
February 09, 2008, at 11:01 AM by M Fisher -
Changed lines 55-56 from:
 Test Results Appendix B part1INT-406-VEN-0109MF8 Feb 08Released
 Test Results Appendix B part2INT-406-VEN-0109MF8 Feb 08Released
to:
 Test Results Appendix B part1INT-406-VEN-0109MF22 Jan 088 Feb 08Released
 Test Results Appendix B part2INT-406-VEN-0109MF22 Jan 088 Feb 08Released
February 09, 2008, at 10:57 AM by M Fisher - added links to test report and results
Changed lines 54-56 from:
 Performance Test ResultsINT-406-VEN-0109MF22 Jan 087 Feb 08Prepared
to:
 Performance Test ResultsINT-406-VEN-0109MF22 Jan 087 Feb 08Released
 Test Results Appendix B part1MF8 Feb 08Released
 Test Results Appendix B part2MF8 Feb 08Released
February 08, 2008, at 11:11 PM by 86.14.236.200 -
Changed line 53 from:
 List of tests: see DraftTestListINT-406-VEN-0108DFB22 Jan 087 Feb 08Drafted
to:
 List of testsINT-406-VEN-0108MF22 Jan 087 Feb 08Released
February 07, 2008, at 09:55 AM by M Fisher -
Changed line 39 from:
 Metrology Layout (for Magdalena Ridge)-XS22 Jan 0822 Jan 083D design completed
to:
 Metrology Layout (for Magdalena Ridge)see metrology design description INT-406-VEN-0113XS22 Jan 0822 Jan 083D design completed
February 07, 2008, at 09:53 AM by M Fisher -
Changed line 35 from:
 Attach:Requirements/DerivedRequirements.pdf | Derived Requirements]]INT-406-VEN-0107DFB22 Jan 0829 Jan 08Released
to:
 Derived RequirementsINT-406-VEN-0107DFB22 Jan 0829 Jan 08Released
February 07, 2008, at 09:52 AM by M Fisher -
Changed line 35 from:
 Attach:Requirements/DerivedRequirements.pdf | Derived RequirementsINT-406-VEN-0107DFB22 Jan 0829 Jan 08Released
to:
 Attach:Requirements/DerivedRequirements.pdf | Derived Requirements]]INT-406-VEN-0107DFB22 Jan 0829 Jan 08Released
February 07, 2008, at 09:52 AM by M Fisher -
Changed line 35 from:
 Attach:Requirements/Derived Δ RequirementsINT-406-VEN-0107DFB22 Jan 0829 Jan 08Released
to:
 Attach:Requirements/DerivedRequirements.pdf | Derived RequirementsINT-406-VEN-0107DFB22 Jan 0829 Jan 08Released
February 07, 2008, at 09:50 AM by M Fisher -
Changed line 35 from:
 Derived RequirementsINT-406-VEN-0107DFB22 Jan 0829 Jan 08Released
to:
 Attach:Requirements/Derived Δ RequirementsINT-406-VEN-0107DFB22 Jan 0829 Jan 08Released
Changed line 45 from:
 Delay Line Pipes and Supports Design DescriptionINT-406-VEN-0115MF/XS/DMAW22 Jan 087 Feb 08Drafted
to:
 Delay Line Pipes and Supports Design DescriptionINT-406-VEN-0115MF/XS/DMAW22 Jan 087 Feb 08Released
February 05, 2008, at 10:39 AM by M Fisher -
Changed line 51 from:
 Proposed Delay Line Set-up Tools, Jigs and Procedures ΔINT-406-VEN-0119MF/XS/DMAW22 Jan 085 Feb 08Released
to:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresINT-406-VEN-0119MF/XS/DMAW22 Jan 085 Feb 08Released
February 05, 2008, at 10:38 AM by M Fisher -
Changed line 51 from:
 [[Attach:HandlingProcedures/handlingProc.pdf Δ |Proposed Delay Line Set-up Tools, Jigs and ProceduresINT-406-VEN-0119MF/XS/DMAW22 Jan 085 Feb 08Released
to:
 Proposed Delay Line Set-up Tools, Jigs and Procedures ΔINT-406-VEN-0119MF/XS/DMAW22 Jan 085 Feb 08Released
February 05, 2008, at 10:36 AM by M Fisher -
Changed line 51 from:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresINT-406-VEN-0119MF/XS/DMAW22 Jan 085 Feb 08Released
to:
 [[Attach:HandlingProcedures/handlingProc.pdf Δ |Proposed Delay Line Set-up Tools, Jigs and ProceduresINT-406-VEN-0119MF/XS/DMAW22 Jan 085 Feb 08Released
January 29, 2008, at 11:30 PM by EBS - Updated power section, added circuit diagrams from RCB and DMAW. Added list of figures.
January 29, 2008, at 11:40 AM by EBS RCB - Added RCB's breakout board circuit diagrams. Added info on limit switches.
January 28, 2008, at 05:36 PM by 131.111.48.85 -
Changed line 15 from:
 Trolley concept description? 6 July 07-Complete
to:
 System Overview? 6 July 07-Complete
January 28, 2008, at 05:05 PM by 131.111.48.85 -
Changed line 44 from:
 Metrology Laser ChoiceINT-406-VEN-0114CAH?22 Jan 0829 Jan 08To be drafted
to:
 Metrology Laser ChoiceINT-406-VEN-0114CAH22 Jan 0829 Jan 08Released
January 24, 2008, at 03:36 PM by EBS RCB - Added low-latency link, tip-tilt, wi-fi and connections text and circuits.
January 22, 2008, at 04:38 PM by M Fisher -
Changed line 19 from:
 VME Software Functional DescriptionINT-406-VEN-0104RCB22 Jan 0822 Jan 08Released (TBU)
to:
 VME Software Functional DescriptionINT-406-VEN-0104RCB22 Jan 0822 Jan 08Released
Changed line 28 from:
 MRO Delay Line Documentation PlanINT-406-VEN-0120MF22 Jan 0822 Jan 08To be drafted
to:
 MRO Delay Line Documentation PlanINT-406-VEN-0120MF22 Jan 0829 Jan 08Drafted
Changed line 35 from:
 Derived RequirementsINT-406-VEN-0107DFB22 Jan 0822 Jan 08In draft
to:
 Derived RequirementsINT-406-VEN-0107DFB22 Jan 0829 Jan 08Drafted
Changed lines 41-43 from:
 Trolley Mechanical Design DescriptionINT-406-VEN-0111MF/XS/DMAW6 July 0722 Jan 08Released (TBU)
 Trolley Electronics Design DescriptionINT-406-VEN-0112MF/RCB/DMAW/EBS22 Jan 0822 Jan 08Released (TBU)
 Metrology System & VME Hardware Design Description (inc. test rig)INT-406-VEN-0113RCB22 Jan 0822 Jan 08To be drafted
to:
 Trolley Mechanical Design DescriptionINT-406-VEN-0111MF/XS/DMAW6 July 0729 Jan 08Released (TBU)
 Trolley Electronics Design DescriptionINT-406-VEN-0112MF/RCB/DMAW/EBS22 Jan 0829 Jan 08Released (TBU)
 Metrology System & VME Hardware Design Description (inc. test rig)INT-406-VEN-0113RCB22 Jan 0824 Jan 08Drafted
Changed line 46 from:
 Limits Design DescriptionINT-406-VEN-0116MF22 Jan 0822 Jan 08Released (TBU)
to:
 Limits Design DescriptionINT-406-VEN-0116MF22 Jan 0829 Jan 08Released (TBU)
Changed line 48 from:
 Proposed design revisionsINT-406-VEN-0117MF22 Jan 0822 Jan 08To be drafted
to:
 Proposed design revisionsINT-406-VEN-0117MF22 Jan 085 Feb 08To be drafted
Changed line 51 from:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresINT-406-VEN-0119MF/XS/DMAW22 Jan 0829 Jan 08To be drafted
to:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresINT-406-VEN-0119MF/XS/DMAW22 Jan 085 Feb 08To be drafted
Changed lines 53-54 from:
 List of tests: see DraftTestListINT-406-VEN-0108DFB22 Jan 0822 Jan 08Drafted
 Performance Test ResultsINT-406-VEN-0109MF22 Jan 0822 Jan 08To be drafted
to:
 List of tests: see DraftTestListINT-406-VEN-0108DFB22 Jan 0824 Jan 08Drafted
 Performance Test ResultsINT-406-VEN-0109MF22 Jan 085 Feb 08Prepared
Changed line 57 from:
 Risk and Hazard documentINT-406-VEN-0121MF22 Jan 0822 Jan 08Drafted (TBU)
to:
 Risk and Hazard documentINT-406-VEN-0121MF22 Jan 0829 Jan 08Drafted (TBU)
Changed line 60 from:
 ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 0722 Jan 08In draft
to:
 ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 0729 Jan 08In draft
January 22, 2008, at 02:08 PM by M Fisher -
Changed line 62 from:
 ICD: Delay line to vacuum systemINT-406-VEN-0011MF22 Jan 0822 Jan 08In draft
to:
 ICD: Delay line to vacuum systemINT-406-VEN-0011MF22 Jan 0822 Jan 08Released
January 14, 2008, at 11:42 AM by 131.111.48.85 -
Changed line 27 from:
 Schedule and budget overview?DFB22 Jan 0829 Jan 08To be drafted
to:
 Schedule and budget overviewINT-406-VEN-0106DFB22 Jan 0829 Jan 08To be drafted
January 14, 2008, at 11:41 AM by 131.111.48.85 -
Changed line 13 from:
Upload toDocumentResponsibleDue DateExpected DateStatus
to:
Upload toDocumentIdentifierResponsibleDue DateExpected DateStatus
Changed lines 15-20 from:
 Trolley concept description 6 July 07-Complete
 Control Software ArchitectureJSY6 July 07-Released
 Trolley Software Functional DescriptionEBS6 July 07-Released
 Workstation Software Functional DescriptionJSY6 July 07-Released
 VME Software Functional DescriptionRCB22 Jan 0822 Jan 08Released (TBU)
 Shear Camera Software Funtional DescriptionEBS6 July 07-Released
to:
 Trolley concept description? 6 July 07-Complete
 Control Software ArchitectureINT-406-VEN-0101JSY6 July 07-Released
 Trolley Software Functional DescriptionINT-406-VEN-0102EBS6 July 07-Released
 Workstation Software Functional DescriptionINT-406-VEN-0103JSY6 July 07-Released
 VME Software Functional DescriptionINT-406-VEN-0104RCB22 Jan 0822 Jan 08Released (TBU)
 Shear Camera Software Funtional DescriptionINT-406-VEN-0105EBS6 July 07-Released
Changed lines 22-23 from:
to:
 Top-level RequirementsINT-406-TSP-0002FS6 July 07-Updated by FS
Changed lines 25-46 from:
Upload toDocumentResponsiblesDue DateExpected DateStatus
Management: for review    
 Schedule and budget overviewDFB22 Jan 0829 Jan 08To be drafted
 MRO Delay Line Documentation PlanMF22 Jan 0822 Jan 08To be drafted
Management: for internal review     
 Schedule for delivery of 1st production trolleyDFB22 Jan 0829 Jan 08To be drafted
 Schedule for Campus Acceptance TestsDFB22 Jan 0829 Jan 08To be drafted
 Contract Deliverables ListDFB22 Jan 0829 Jan 08Exists in contract
 Production Phase BudgetsDFB22 Jan 0829 Jan 08To be drafted
Requirements    
 Derived RequirementsDFB22 Jan 0822 Jan 08In draft
Design Drawings     
 TrolleyXS22 Jan 0811 Jan 08Updated
 Delay Line Pipes and SupportsXS8 Jan 20088 Jan 08Released
 Metrology Layout (for Magdalena Ridge)XS22 Jan 0822 Jan 083D design completed
Design Documentation     
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 July 0722 Jan 08Released (TBU)
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS22 Jan 0822 Jan 08Released (TBU)
 Metrology System & VME Hardware Design Description (inc. test rig)RCB22 Jan 0822 Jan 08To be drafted
 Metrology Laser ChoiceCAH?22 Jan 0829 Jan 08To be drafted
 Delay Line Pipes and Supports Design DescriptionMF/XS/DMAW22 Jan 0822 Jan 08To be drafted
 Limits Design DescriptionMF22 Jan 0822 Jan 08Released (TBU)
to:
Upload toDocumentIdentifierResponsiblesDue DateExpected DateStatus
Management: for review     
 Schedule and budget overview?DFB22 Jan 0829 Jan 08To be drafted
 MRO Delay Line Documentation PlanINT-406-VEN-0120MF22 Jan 0822 Jan 08To be drafted
Management: for internal review      
 Schedule for delivery of 1st production trolleyINT-406-VEN-0122DFB22 Jan 0829 Jan 08To be drafted
 Schedule for Campus Acceptance TestsINT-406-VEN-0123DFB22 Jan 0829 Jan 08To be drafted
 Contract Deliverables ListINT-406-VEN-0124DFB22 Jan 0829 Jan 08Exists in contract
 Production Phase BudgetsINT-406-VEN-0125DFB22 Jan 0829 Jan 08To be drafted
Requirements      
 Derived RequirementsINT-406-VEN-0107DFB22 Jan 0822 Jan 08In draft
Design Drawings      
 Trolley-XS22 Jan 0811 Jan 08Updated
 Delay Line Pipes and Supports-XS8 Jan 20088 Jan 08Released
 Metrology Layout (for Magdalena Ridge)-XS22 Jan 0822 Jan 083D design completed
Design Documentation      
 Trolley Mechanical Design DescriptionINT-406-VEN-0111MF/XS/DMAW6 July 0722 Jan 08Released (TBU)
 Trolley Electronics Design DescriptionINT-406-VEN-0112MF/RCB/DMAW/EBS22 Jan 0822 Jan 08Released (TBU)
 Metrology System & VME Hardware Design Description (inc. test rig)INT-406-VEN-0113RCB22 Jan 0822 Jan 08To be drafted
 Metrology Laser ChoiceINT-406-VEN-0114CAH?22 Jan 0829 Jan 08To be drafted
 Delay Line Pipes and Supports Design DescriptionINT-406-VEN-0115MF/XS/DMAW22 Jan 0822 Jan 08To be drafted
 Limits Design DescriptionINT-406-VEN-0116MF22 Jan 0822 Jan 08Released (TBU)
Changed lines 48-49 from:
 Component ListsMF22 Jan 0829 Jan 08Drafted (TBU)
to:
 Proposed design revisionsINT-406-VEN-0117MF22 Jan 0822 Jan 08To be drafted
 Component ListsINT-406-VEN-0118MF22 Jan 0829 Jan 08Drafted (TBU)
Changed lines 51-55 from:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresMF/XS/DMAW22 Jan 0829 Jan 08To be drafted
Test Results    
 List of tests: see DraftTestListDFB22 Jan 0822 Jan 08Drafted
 Performance Test ResultsMF22 Jan 0822 Jan 08To be drafted
 Production trolley Acceptance Test PlanDFB22 Jan 0829 Jan 08To be drafted
to:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresINT-406-VEN-0119MF/XS/DMAW22 Jan 0829 Jan 08To be drafted
Test Results     
 List of tests: see DraftTestListINT-406-VEN-0108DFB22 Jan 0822 Jan 08Drafted
 Performance Test ResultsINT-406-VEN-0109MF22 Jan 0822 Jan 08To be drafted
 Production trolley Acceptance Test PlanINT-406-VEN-0110DFB22 Jan 0829 Jan 08To be drafted
Changed lines 57-66 from:
 Risk and Hazard documentMF22 Jan 0822 Jan 08Drafted (TBU)
Interface Control     
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF6 Nov 07-Released
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF21 Dec 0722 Jan 08In draft
 ICD: Delay line to metrology system (INT-406-VEN-0010)MF6 Nov 07-Released
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MF22 Jan 0822 Jan 08In draft
 ICD: Metrology System to BCF (INT-406-VEN-0012)MF6 Nov 07-Released
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)MF6 Nov 07-Released
FDR Overheads  11 Feb 0811 Feb 08To be drafted
to:
 Risk and Hazard documentINT-406-VEN-0121MF22 Jan 0822 Jan 08Drafted (TBU)
Interface Control      
 ICD: Delay line to Beam Relay systemINT-406-VEN-0008MF6 Nov 07-Released
 ICD: Delay line to BCF infrastructure (building)INT-406-VEN-0009MF21 Dec 0722 Jan 08In draft
 ICD: Delay line to metrology systemINT-406-VEN-0010MF6 Nov 07-Released
 ICD: Delay line to vacuum systemINT-406-VEN-0011MF22 Jan 0822 Jan 08In draft
 ICD: Metrology System to BCFINT-406-VEN-0012MF6 Nov 07-Released
 ICD: Metrology System to Beam Relay SystemINT-406-VEN-0013MF6 Nov 07-Released
FDR Overheads   11 Feb 0811 Feb 08To be drafted
January 11, 2008, at 05:44 PM by 86.6.10.139 -
Added line 28:
 MRO Delay Line Documentation PlanMF22 Jan 0822 Jan 08To be drafted
Changed line 32 from:
 Contract Deliverables List inc. Tables of ContentsDFB22 Jan 0829 Jan 08Exists in contract
to:
 Contract Deliverables ListDFB22 Jan 0829 Jan 08Exists in contract
January 11, 2008, at 05:27 PM by 86.6.10.139 -
Changed line 26 from:
to:
Management: for review    
Changed line 28 from:
to:
Management: for internal review     
Changed lines 31-32 from:
 Contract Deliverables List? inc. Tables of ContentsDFB22 Jan 0829 Jan 08Exists in contract
 Production Phase Budgets?DFB22 Jan 0829 Jan 08To be drafted
to:
 Contract Deliverables List inc. Tables of ContentsDFB22 Jan 0829 Jan 08Exists in contract
 Production Phase BudgetsDFB22 Jan 0829 Jan 08To be drafted
January 11, 2008, at 04:07 PM by 131.111.48.85 -
Changed line 43 from:
 Metrology Laser ChoiceTBD22 Jan 0829 Jan 08To be drafted
to:
 Metrology Laser ChoiceCAH?22 Jan 0829 Jan 08To be drafted
Changed line 53 from:
 Production trolley Acceptance Test PlanDFB22 Jan 0829 Jan 08 
to:
 Production trolley Acceptance Test PlanDFB22 Jan 0829 Jan 08To be drafted
Changed line 55 from:
 Risk and Hazard documentMF22 Jan 0822 Jan 08Draft
to:
 Risk and Hazard documentMF22 Jan 0822 Jan 08Drafted (TBU)
Changed lines 57-64 from:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF6 Nov 07-Released
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF21 Dec 0722 Jan 08In draft
 ICD: Delay line to metrology system (INT-406-VEN-0010)MF6 Nov 07- Released
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MF22 Jan 0822 Jan 08In draft
 ICD: Metrology System to BCF (INT-406-VEN-0012)MF6 Nov 07-Released
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)MF6 Nov 07-Released
FDR Overheads  11 Feb 08 
to:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF6 Nov 07-Released
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF21 Dec 0722 Jan 08In draft
 ICD: Delay line to metrology system (INT-406-VEN-0010)MF6 Nov 07-Released
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MF22 Jan 0822 Jan 08In draft
 ICD: Metrology System to BCF (INT-406-VEN-0012)MF6 Nov 07-Released
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)MF6 Nov 07-Released
FDR Overheads  11 Feb 0811 Feb 08To be drafted
January 11, 2008, at 03:56 PM by 131.111.48.85 -
Changed line 45 from:
 Limits Design DescriptionMF6 July-Released
to:
 Limits Design DescriptionMF22 Jan 0822 Jan 08Released (TBU)
Changed line 47 from:
 Component ListsMF22 Jan 08Needs updating
to:
 Component ListsMF22 Jan 0829 Jan 08Drafted (TBU)
Changed lines 49-50 from:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresTBD22 Jan 08To be drafted
 Proposed Handling Tools and ProceduresTBD22 Jan 08To be drafted
to:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresMF/XS/DMAW22 Jan 0829 Jan 08To be drafted
January 11, 2008, at 03:53 PM by 131.111.48.85 -
Changed line 37 from:
 Delay Line Pipes and SupportsXS8 Jan 20088 Jan 2008Released
to:
 Delay Line Pipes and SupportsXS8 Jan 20088 Jan 08Released
January 11, 2008, at 03:51 PM by 131.111.48.85 -
Changed lines 27-28 from:
 Schedule and budget overviewDFB22 Jan 0829 Jan 08To be drafted
Management Documents for internal review?     
to:
 Schedule and budget overviewDFB22 Jan 0829 Jan 08To be drafted
Management Documents for internal review?     
Changed lines 35-37 from:
Design Drawings    
 TrolleyXS22 JanReleased 6 July - minor updates required
 Delay Line Pipes and Supports ΔXS8 Jan 2008Released 8 Jan
to:
Design Drawings     
 TrolleyXS22 Jan 0811 Jan 08Updated
 Delay Line Pipes and SupportsXS8 Jan 20088 Jan 2008Released
Changed line 39 from:
to:
January 11, 2008, at 03:48 PM by 131.111.48.85 -
Changed line 25 from:
Upload toDocumentResponsiblesDue DateStatus
to:
Upload toDocumentResponsiblesDue DateExpected DateStatus
Changed lines 27-32 from:
 Schedule and budget overviewDFB22 Jan 08To be drafted
Management Documents for internal review?    
 Schedule for delivery of 1st production trolleyDFBTBD 
 Schedule for Campus Acceptance TestsDFBTBD 
 Contract Deliverables List? inc. Tables of ContentsDFBTBD 
 Production Phase Budgets?DFBTBD 
to:
 Schedule and budget overviewDFB22 Jan 0829 Jan 08To be drafted
Management Documents for internal review?     
 Schedule for delivery of 1st production trolleyDFB22 Jan 0829 Jan 08To be drafted
 Schedule for Campus Acceptance TestsDFB22 Jan 0829 Jan 08To be drafted
 Contract Deliverables List? inc. Tables of ContentsDFB22 Jan 0829 Jan 08Exists in contract
 Production Phase Budgets?DFB22 Jan 0829 Jan 08To be drafted
Changed line 34 from:
 Derived RequirementsDFB22 Jan 08In draft
to:
 Derived RequirementsDFB22 Jan 0822 Jan 08In draft
Changed line 38 from:
 Metrology Layout (for Magdalena Ridge)XS22 Jan 083D design completed
to:
 Metrology Layout (for Magdalena Ridge)XS22 Jan 0822 Jan 083D design completed
Changed lines 40-46 from:
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 JulyReleased
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS22 Jan 08Released 6 July - requires updating
 Metrology System & VME Hardware Design Description (inc. test rig)RCB22 Jan 08In drafting
 Metrology Laser ChoiceTBD22 Jan 08gathering information
 Delay Line Pipes and Supports Design DescriptionMF/XS/DMAW17 July 
 Limits Design DescriptionMF6 JulyReleased
Component Documentation   
to:
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 July 0722 Jan 08Released (TBU)
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS22 Jan 0822 Jan 08Released (TBU)
 Metrology System & VME Hardware Design Description (inc. test rig)RCB22 Jan 0822 Jan 08To be drafted
 Metrology Laser ChoiceTBD22 Jan 0829 Jan 08To be drafted
 Delay Line Pipes and Supports Design DescriptionMF/XS/DMAW22 Jan 0822 Jan 08To be drafted
 Limits Design DescriptionMF6 July-Released
Component Documentation    
Changed lines 48-49 from:
Handling Procedures   
 Proposed Delay Line Set-up Tools, Jigs and ProceduresTBD22 Jan 08To be drafted
to:
Handling Procedures    
 Proposed Delay Line Set-up Tools, Jigs and ProceduresTBD22 Jan 08To be drafted
Changed lines 52-54 from:
 List of tests: see DraftTestListDFB22 Jan 08Notes written
 Test results document relating tests to derived requirementsMF22 Jan 08 
 Production trolley Acceptance Test PlanDFB22 Jan 08 
to:
 List of tests: see DraftTestListDFB22 Jan 0822 Jan 08Drafted
 Performance Test ResultsMF22 Jan 0822 Jan 08To be drafted
 Production trolley Acceptance Test PlanDFB22 Jan 0829 Jan 08 
Changed lines 56-63 from:
 Risk and Hazard documentMF22 Jan 08Draft
Interface Control    
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF6 Nov 07Released
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF22 Jan 08In draft
 ICD: Delay line to metrology system (INT-406-VEN-0010)MF6 Nov 07Released
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MF22 Jan 08Part drafted
 ICD: Metrology System to BCF (INT-406-VEN-0012)MF6 Nov 07Released
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)MF6 Nov 07Released
to:
 Risk and Hazard documentMF22 Jan 0822 Jan 08Draft
Interface Control     
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF6 Nov 07-Released
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF21 Dec 0722 Jan 08In draft
 ICD: Delay line to metrology system (INT-406-VEN-0010)MF6 Nov 07- Released
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MF22 Jan 0822 Jan 08In draft
 ICD: Metrology System to BCF (INT-406-VEN-0012)MF6 Nov 07-Released
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)MF6 Nov 07-Released
January 11, 2008, at 03:15 PM by 131.111.48.85 -
Changed line 13 from:
Upload toDocumentResponsibleDue DateStatus
to:
Upload toDocumentResponsibleDue DateExpected DateStatus
Changed lines 15-20 from:
to:
 Trolley concept description 6 July 07-Complete
 Control Software ArchitectureJSY6 July 07-Released
 Trolley Software Functional DescriptionEBS6 July 07-Released
 Workstation Software Functional DescriptionJSY6 July 07-Released
 VME Software Functional DescriptionRCB22 Jan 0822 Jan 08Released (TBU)
 Shear Camera Software Funtional DescriptionEBS6 July 07-Released
Changed lines 22-23 from:
to:
January 09, 2008, at 05:50 PM by M Fisher -
Changed line 37 from:
 Delay Line Pipes and SupportsXS8 Jan 2008Released 8 Jan
to:
 Delay Line Pipes and Supports ΔXS8 Jan 2008Released 8 Jan
January 09, 2008, at 04:05 PM by M Fisher -
Changed line 59 from:
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF22 Jan 08In draft
to:
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF22 Jan 08In draft
January 09, 2008, at 04:03 PM by M Fisher -
Changed line 13 from:
Upload toDocumentResponsiblesDue DateStatus
to:
Upload toDocumentResponsibleDue DateStatus
January 09, 2008, at 04:01 PM by M Fisher -
Changed line 34 from:
 Derived RequirementsDFB22 Jan 08In draft
to:
 Derived RequirementsDFB22 Jan 08In draft
January 09, 2008, at 04:00 PM by M Fisher -
Changed line 43 from:
 Metrology Laser ChoiceTBD22 Jan 08gathering information
to:
 Metrology Laser ChoiceTBD22 Jan 08gathering information
January 09, 2008, at 03:58 PM by M Fisher -
Changed line 28 from:
to:
Added line 43:
 Metrology Laser ChoiceTBD22 Jan 08gathering information
January 09, 2008, at 03:53 PM by M Fisher -
Changed line 28 from:
[[Management Documents for internal review    
to:
Changed line 46 from:
 Component ListsMFTBDNeeds updating
to:
 Component ListsMF22 Jan 08Needs updating
Changed lines 48-49 from:
 Nothing for FDR?   
to:
 Proposed Delay Line Set-up Tools, Jigs and ProceduresTBD22 Jan 08To be drafted
 Proposed Handling Tools and ProceduresTBD22 Jan 08To be drafted
Changed lines 51-53 from:
 List of tests: see DraftTestListDFB17 JulyNotes written
 Test results document relating tests to derived requirementsMFTBD 
 Production trolley Acceptance Test PlanDFBTBD 
to:
 List of tests: see DraftTestListDFB22 Jan 08Notes written
 Test results document relating tests to derived requirementsMF22 Jan 08 
 Production trolley Acceptance Test PlanDFB22 Jan 08 
Changed line 55 from:
 Risk and Hazard documentMF17 JulyDraft
to:
 Risk and Hazard documentMF22 Jan 08Draft
Changed lines 57-65 from:
 ICD: Delay line to ICS (INT-406-ENG-0002)TC  
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MFTBD 
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MFTBD 
 ICD: Delay line to metrology system (INT-406-VEN-0010)RCBTBD 
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MFTBD 
 ICD: Metrology System to BCF (INT-406-VEN-0012)RCBTBD 
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)RCBTBD 
FDR Overheads  6 November 
to:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF6 Nov 07Released
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF22 Jan 08In draft
 ICD: Delay line to metrology system (INT-406-VEN-0010)MF6 Nov 07Released
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MF22 Jan 08Part drafted
 ICD: Metrology System to BCF (INT-406-VEN-0012)MF6 Nov 07Released
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)MF6 Nov 07Released
FDR Overheads  11 Feb 08 
January 09, 2008, at 03:39 PM by M Fisher -
Changed lines 26-28 from:
Schedule?    
to:
Schedule for Review?    
 Schedule and budget overviewDFB22 Jan 08To be drafted
[[Management Documents for internal review    
January 08, 2008, at 05:55 PM by M Fisher -
Changed line 19 from:
to:
 VME Software Functional DescriptionRCB22 Jan 08Released - requires updating
Changed line 32 from:
 Derived RequirementsDFB17 July 
to:
 Derived RequirementsDFB22 Jan 08In draft
Changed lines 34-36 from:
 TrolleyXS6 July2nd release made 12 July
 Delay Line Pipes and SupportsXS8 Jan 2008Released
 Metrology Layout (for Magdalena Ridge)XS17 July 
to:
 TrolleyXS22 JanReleased 6 July - minor updates required
 Delay Line Pipes and SupportsXS8 Jan 2008Released 8 Jan
 Metrology Layout (for Magdalena Ridge)XS22 Jan 083D design completed
Changed lines 39-40 from:
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS6 JulyReleased
 Metrology System & VME Hardware Design Description (inc. test rig)RCB17 July 
to:
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS22 Jan 08Released 6 July - requires updating
 Metrology System & VME Hardware Design Description (inc. test rig)RCB22 Jan 08In drafting
January 08, 2008, at 05:40 PM by M Fisher -
Changed line 35 from:
to:
 Delay Line Pipes and SupportsXS8 Jan 2008Released
January 08, 2008, at 05:39 PM by M Fisher -
Changed line 35 from:
 [[Attach:DesignDrawings/Pipesuppmech.zip | Delay Line Pipes and SupportsXS17 July 
to:
January 08, 2008, at 05:36 PM by M Fisher -
Changed line 35 from:
 Delay Line Pipes and SupportsXS17 July 
to:
 [[Attach:DesignDrawings/Pipesuppmech.zip | Delay Line Pipes and SupportsXS17 July 
August 17, 2007, at 09:43 AM by 131.111.48.85 -
Changed line 55 from:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MFTBD 
to:
Changed line 57 from:
 ICD: Delay line to metrology system (INT-406-VEN-0010)RCBTBD 
to:
Changed lines 59-60 from:
 ICD: Metrology System to BCF (INT-406-VEN-0012)RCBTBD 
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)RCBTBD 
to:
July 12, 2007, at 05:27 PM by 131.111.48.85 -
Changed lines 1-2 from:

The set of documents required for the July 2007 Final Design Review is based on MF's FDR Proposal Document.

to:

The set of documents required for the 2007 Final Design Review is based on MF's FDR Proposal Document.

Deleted lines 10-15:

The due date for each of the following documents should be one of the following:

  • 6 July - 2.5 weeks before Part A of the review
  • 17 July - 1 week before Part A of the review
  • 24 July - start of Part A of the review
  • [PartB] - Part B of the review (date is TBD)
Changed lines 27-30 from:
 Schedule for delivery of 1st production trolleyDFBPartB 
 Schedule for Campus Acceptance TestsDFBPartB 
 Contract Deliverables List? inc. Tables of ContentsDFBPartB 
 Production Phase Budgets?DFBPartB 
to:
 Schedule for delivery of 1st production trolleyDFBTBD 
 Schedule for Campus Acceptance TestsDFBTBD 
 Contract Deliverables List? inc. Tables of ContentsDFBTBD 
 Production Phase Budgets?DFBTBD 
Changed line 34 from:
 TrolleyXS6 JulyReleased
to:
 TrolleyXS6 July2nd release made 12 July
Changed line 40 from:
 Metrology System & VME Hardware Design DescriptionRCB17 July 
to:
 Metrology System & VME Hardware Design Description (inc. test rig)RCB17 July 
Changed line 44 from:
 Component ListsMF17 JulyNeeds updating
to:
 Component ListsMFTBDNeeds updating
Changed lines 49-50 from:
 Test results document relating tests to derived requirementsMF24 July 
 Production trolley Acceptance Test PlanDFBPartB 
to:
 Test results document relating tests to derived requirementsMFTBD 
 Production trolley Acceptance Test PlanDFBTBD 
Changed lines 55-62 from:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF17 July 
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MFPartB 
 ICD: Delay line to metrology system (INT-406-VEN-0010)RCBPartB 
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MFPartB 
 ICD: Metrology System to BCF (INT-406-VEN-0012)RCB17 July 
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)RCB17 July 
FDR Overheads  24 July 
to:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MFTBD 
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MFTBD 
 ICD: Delay line to metrology system (INT-406-VEN-0010)RCBTBD 
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MFTBD 
 ICD: Metrology System to BCF (INT-406-VEN-0012)RCBTBD 
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)RCBTBD 
FDR Overheads  6 November 
July 12, 2007, at 11:47 AM by 131.111.48.85 -
Changed lines 22-26 from:
 Control Software ArchitectureJSY6 JulyChecked by EBS
 Trolley Software Functional DescriptionEBS6 JulyChecked by JSY
 Workstation Software Functional DescriptionJSY6 JulyChecked by EBS
 VME Software Functional DescriptionRCB6 JulyEdited by JSY, checked by EBS
 Shear Camera Software Functional DescriptionEBS6 JulyChecked by JSY
to:
Changed line 40 from:
 TrolleyXS6 July 
to:
 TrolleyXS6 JulyReleased
Changed lines 44-45 from:
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 JulyComplete
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS6 JulyComplete
to:
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 JulyReleased
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS6 JulyReleased
Changed line 48 from:
 Limits Design DescriptionMF6 JulyCompleted
to:
 Limits Design DescriptionMF6 JulyReleased
July 11, 2007, at 03:35 PM by 131.111.48.85 -
Changed line 40 from:
 TrolleyXS6 July 
to:
 TrolleyXS6 July 
July 11, 2007, at 10:15 AM by 131.111.48.85 -
Changed line 25 from:
 VME Software Functional DescriptionRCB6 JulyComplete, needs proofreading
to:
 VME Software Functional DescriptionRCB6 JulyEdited by JSY, checked by EBS
July 09, 2007, at 04:58 PM by 131.111.48.85 -
Changed line 23 from:
 Trolley Software Functional DescriptionEBS6 JulyComplete, needs proofreading
to:
 Trolley Software Functional DescriptionEBS6 JulyChecked by JSY
Changed line 26 from:
 Shear Camera Software Functional DescriptionEBS6 JulyComplete, needs proofreading
to:
Changed line 44 from:
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 JulyFirst draft - needs check
to:
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 JulyFirst draft - needs check
Changed line 48 from:
 Limits Design DescriptionMF6 July 
to:
 Limits Design DescriptionMF6 JulyNeeds pruning
July 09, 2007, at 04:47 PM by 131.111.48.85 -
Added lines 9-10:

To release a document, place a link to it on the ReleasedFDRDocuments page.

July 09, 2007, at 10:29 AM by 131.111.48.85 -
Changed line 20 from:
 Control Software ArchitectureJSY6 JulyComplete, needs proofreading
to:
 Control Software ArchitectureJSY6 JulyChecked by EBS
July 09, 2007, at 10:14 AM by 131.111.48.85 -
Changed line 22 from:
 Workstation Software Functional DescriptionJSY6 JulyComplete, needs proofreading
to:
July 09, 2007, at 09:47 AM by MF -
Changed line 42 from:
 Trolley Mechanical Design Description ΔMF/XS/DMAW6 JulyFirst draft - needs check
to:
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 JulyFirst draft - needs check
July 09, 2007, at 09:44 AM by MF -
Changed line 42 from:
 Trolley Mechanical Design Description ΔMF/XS/DMAW6 JulyFirst draft - needs checking
to:
 Trolley Mechanical Design Description ΔMF/XS/DMAW6 JulyFirst draft - needs check
July 09, 2007, at 09:43 AM by MF -
Changed line 42 from:
 [[Attach: trolley_mech_design.pdf |Trolley Mechanical Design DescriptionMF/XS/DMAW6 July 
to:
 Trolley Mechanical Design Description ΔMF/XS/DMAW6 JulyFirst draft - needs checking
July 06, 2007, at 03:43 AM by EBS DMAW - Incorporated additions and changes from DMAW in cartelec.pdf
July 06, 2007, at 02:57 AM by EBS - Added link to trolley software functional description
Changed line 21 from:
 Trolley Software Functional DescriptionEBS6 July 
to:
 Trolley Software Functional DescriptionEBS6 JulyComplete, needs proofreading
July 05, 2007, at 06:49 PM by 131.111.48.85 -
Changed lines 22-23 from:
 Workstation Software Functional DescriptionJSY6 JulyIn progress
 VME Software Functional DescriptionRCB6 July 
to:
 Workstation Software Functional DescriptionJSY6 JulyComplete, needs proofreading
 VME Software Functional DescriptionRCB6 JulyComplete, needs proofreading
July 05, 2007, at 11:35 AM by 131.111.48.85 -
Added line 46:
 Limits Design DescriptionMF6 July 
July 04, 2007, at 04:07 PM by 131.111.48.85 -
Changed lines 26-27 from:
to:
July 04, 2007, at 03:46 PM by 131.111.48.85 -
Changed lines 17-18 from:
 DocumentResponsiblesDue DateStatus
to:
Upload toDocumentResponsiblesDue DateStatus
Design Documentation    
Changed line 20 from:
 Control Software ArchitectureJSY6 July 
to:
 Control Software ArchitectureJSY6 JulyComplete, needs proofreading
Added line 25:
Requirements    
July 03, 2007, at 04:06 PM by 131.111.48.85 -
Changed lines 7-8 from:

Document templates may be obtained from XXX

to:

Document templates may be obtained from DocMan.

July 03, 2007, at 04:05 PM by 131.111.48.85 -
Added lines 5-8:

Please upload your document in PDF format to the appropriate page linked from the first column in the table below (rather than this page) - for example, the "Derived Requirements" document should be uploaded to Requirements. You should then make a link from this page (from the table) to the uploaded document.

Document templates may be obtained from XXX

Added line 19:
 Control Software ArchitectureJSY6 July 
Changed lines 24-25 from:
to:
Changed line 34 from:
 Derived RequirementsDFB6 July 
to:
 Derived RequirementsDFB17 July 
Changed line 43 from:
 Delay Line Pipes and SupportsMF/XS/DMAW17 July 
to:
 Delay Line Pipes and Supports Design DescriptionMF/XS/DMAW17 July 
Changed line 56 from:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF17 July? 
to:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF17 July 
July 03, 2007, at 01:41 PM by EBS MF - Added appendix with MF's catseye amp circuit diagrams
July 03, 2007, at 12:31 PM by EBS MF RCB - Incorporated additions and changes from MF and RCB in cartelec.pdf
July 03, 2007, at 12:16 PM by 131.111.48.85 -
Changed lines 6-7 from:
  • 3 July - advance material for Part A of the review
to:
  • 6 July - 2.5 weeks before Part A of the review
  • 17 July - 1 week before Part A of the review
Changed lines 9-10 from:
  • [TBDPartB] - Part B of the review
to:
  • [PartB] - Part B of the review (date is TBD)
Changed lines 14-18 from:
 Trolley concept description 3 JulyComplete
 Software Functional DescriptionEBS/JSY3 July??In progress
 Shear Camera Software Functional DescriptionEBS3 July??Complete, needs cross references
 Top-level Requirements INT-406-TSP-0002.pdfFS3 JulyRevisions needed
to:
 Trolley concept description 6 JulyComplete
 Trolley Software Functional DescriptionEBS6 July 
 Workstation Software Functional DescriptionJSY6 JulyIn progress
 VME Software Functional DescriptionRCB6 July 
 Shear Camera Software Functional DescriptionEBS6 JulyComplete, needs cross references
 Top-level Requirements INT-406-TSP-0002.pdfFS6 JulyRevisions needed
Changed lines 24-27 from:
 Schedule for delivery of 1st production trolleyDFB  
 Schedule for Campus Acceptance TestsDFB  
 Contract Deliverables List? inc. Tables of ContentsDFB  
 Production Phase Budgets?DFB  
to:
 Schedule for delivery of 1st production trolleyDFBPartB 
 Schedule for Campus Acceptance TestsDFBPartB 
 Contract Deliverables List? inc. Tables of ContentsDFBPartB 
 Production Phase Budgets?DFBPartB 
Changed line 29 from:
 Derived RequirementsDFB  
to:
 Derived RequirementsDFB6 July 
Changed lines 31-33 from:
 TrolleyXS  
 Delay Line Pipes and SupportsXS  
 Metrology Layout (for Magdalena Ridge)XS  
to:
 TrolleyXS6 July 
 Delay Line Pipes and SupportsXS17 July 
 Metrology Layout (for Magdalena Ridge)XS17 July 
Changed lines 35-38 from:
 Trolley Mechanical Design DescriptionXS/DMAW  
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS3 July?Incomplete draft
 Metrology System & VME Design DescriptionRCB  
 Delay Line Pipes and SupportsXS/DMAW/MF  
to:
 Trolley Mechanical Design DescriptionMF/XS/DMAW6 July 
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS6 JulyIncomplete draft
 Metrology System & VME Hardware Design DescriptionRCB17 July 
 Delay Line Pipes and SupportsMF/XS/DMAW17 July 
Changed line 40 from:
 Component ListsMF3 July?Complete?
to:
 Component ListsMF17 JulyNeeds updating
Changed lines 44-46 from:
 List of tests: see DraftTestListDFB Notes written
 Test results document relating tests to derived requirementsMF  
 Production trolley Acceptance Test PlanDFB  
to:
 List of tests: see DraftTestListDFB17 JulyNotes written
 Test results document relating tests to derived requirementsMF24 July 
 Production trolley Acceptance Test PlanDFBPartB 
Changed line 48 from:
 Risk and Hazard documentMF24 July?Draft
to:
 Risk and Hazard documentMF17 JulyDraft
Changed lines 51-58 from:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF  
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF  
 ICD: Delay line to metrology system (INT-406-VEN-0010)RCB  
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MF  
 ICD: Metrology System to BCF (INT-406-VEN-0012)RCB  
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)RCB  
FDR Overheads    
to:
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF17 July? 
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MFPartB 
 ICD: Delay line to metrology system (INT-406-VEN-0010)RCBPartB 
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MFPartB 
 ICD: Metrology System to BCF (INT-406-VEN-0012)RCB17 July 
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)RCB17 July 
FDR Overheads  24 July 
July 02, 2007, at 05:55 PM by EBS MF - Added MF's preamp section to cartelec.pdf and made other minor changes suggested by MF.
July 02, 2007, at 01:51 PM by 131.111.48.117 -
Added line 15:
 Shear Camera Software Functional DescriptionEBS3 July??Complete, needs cross references
June 29, 2007, at 05:50 PM by 131.111.48.85 -
Changed line 44 from:
 Risk and Hazard documentMF  
to:
 Risk and Hazard documentMF24 July?Draft
June 29, 2007, at 05:48 PM by 131.111.48.85 -
Changed line 36 from:
 Component ListsMF   
to:
 Component ListsMF3 July? Complete?
June 29, 2007, at 05:47 PM by 131.111.48.85 -
Changed line 14 from:
 Software Functional DescriptionEBS/JSY24 JulyIn progress
to:
 Software Functional DescriptionEBS/JSY3 July??In progress
June 29, 2007, at 05:45 PM by 131.111.48.85 -
Changed line 40 from:
 List of tests: see DraftTestListDFB  
to:
 List of tests: see DraftTestListDFB Notes written
June 29, 2007, at 05:43 PM by 131.111.48.85 -
Changed line 14 from:
 Software Functional DescriptionEBS/JSY  
to:
 Software Functional DescriptionEBS/JSY24 JulyIn progress
Changed line 32 from:
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS3 July? 
to:
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS3 July?Incomplete draft
June 29, 2007, at 05:42 PM by 131.111.48.85 -
Changed lines 18-19 from:
 DocumentResponsiblesDue DateStatus
Management (see Schedule?):    
to:
Upload toDocumentResponsiblesDue DateStatus
Schedule?    
Changed line 24 from:
Requirements:    
to:
Requirements    
Changed line 26 from:
Design Drawings:    
to:
Changed line 30 from:
to:
Changed line 32 from:
to:
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS3 July? 
Changed line 35 from:
to:
Changed line 37 from:
to:
Changed line 39 from:
Testing?:    
to:
Test Results    
Changed line 43 from:
to:
Changed line 45 from:
to:
June 29, 2007, at 05:37 PM by 131.111.48.85 -
Changed line 42 from:
 Production trolley Acceptance Test Plan   
to:
 Production trolley Acceptance Test PlanDFB  
June 29, 2007, at 05:34 PM by 131.111.48.85 -
Changed lines 20-23 from:
 Schedule for delivery of 1st production trolley   
 Schedule for Campus Acceptance Tests   
 Contract Deliverables List? inc. Tables of Contents   
 Production Phase Budgets?   
to:
 Schedule for delivery of 1st production trolleyDFB  
 Schedule for Campus Acceptance TestsDFB  
 Contract Deliverables List? inc. Tables of ContentsDFB  
 Production Phase Budgets?DFB  
Changed line 36 from:
 Component Lists    
to:
 Component ListsMF   
Changed line 48 from:
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)   
to:
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)MF  
June 29, 2007, at 05:31 PM by 131.111.48.85 -
Changed lines 12-16 from:
DocumentResponsiblesDue DateStatus
Trolley concept description 3 JulyComplete
Software Functional DescriptionEBS/JSY  
Top-level Requirements INT-406-TSP-0002.pdfFS3 JulyRevisions needed
to:
 DocumentResponsiblesDue DateStatus
 Trolley concept description 3 JulyComplete
 Software Functional DescriptionEBS/JSY  
 Top-level Requirements INT-406-TSP-0002.pdfFS3 JulyRevisions needed
Changed lines 18-54 from:
DocumentResponsiblesDue DateStatus
Management:   
Schedule for delivery of 1st production trolley   
Schedule for Campus Acceptance Tests   
Contract Deliverables List? inc. Tables of Contents   
Production Phase Budgets?   
Requirements:   
Derived RequirementsDFB  
Design Drawings:   
TrolleyXS  
Delay Line Pipes and SupportsXS  
Metrology Layout (for Magdalena Ridge)XS  
Design Documentation:   
Trolley Mechanical Design DescriptionXS/DMAW  
Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS  
Metrology System & VME Design DescriptionRCB  
Delay Line Pipes and SupportsXS/DMAW/MF  
Component Documentation:   
Component Lists   
Handling Procedures:   
Nothing for FDR?   
Testing:   
List of tests: see DraftTestListDFB  
Test results document relating tests to derived requirementsMF  
Production trolley Acceptance Test Plan   
Risk and Hazard Assessment:   
Risk and Hazard documentMF  
Interface Control:   
ICD: Delay line to ICS (INT-406-ENG-0002)   
ICD: Delay line to Beam Relay system (INT-406-VEN-0008)   
ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)   
ICD: Delay line to metrology system (INT-406-VEN-0010)   
ICD: Delay line to vacuum system (INT-406-VEN-0011)   
ICD: Metrology System to BCF (INT-406-VEN-0012)   
ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)   
FDR Overheads   
to:
 DocumentResponsiblesDue DateStatus
Management (see Schedule?):    
 Schedule for delivery of 1st production trolley   
 Schedule for Campus Acceptance Tests   
 Contract Deliverables List? inc. Tables of Contents   
 Production Phase Budgets?   
Requirements:    
 Derived RequirementsDFB  
Design Drawings:    
 TrolleyXS  
 Delay Line Pipes and SupportsXS  
 Metrology Layout (for Magdalena Ridge)XS  
Design Documentation:    
 Trolley Mechanical Design DescriptionXS/DMAW  
 Trolley Electronics Design DescriptionMF/RCB/DMAW/EBS  
 Metrology System & VME Design DescriptionRCB  
 Delay Line Pipes and SupportsXS/DMAW/MF  
Component Documentation:   
 Component Lists    
Handling Procedures:   
 Nothing for FDR?   
Testing?:    
 List of tests: see DraftTestListDFB  
 Test results document relating tests to derived requirementsMF  
 Production trolley Acceptance Test Plan   
Risk and Hazard Assessment:    
 Risk and Hazard documentMF  
Interface Control:    
 ICD: Delay line to ICS (INT-406-ENG-0002)TC  
 ICD: Delay line to Beam Relay system (INT-406-VEN-0008)MF  
 ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)   
 ICD: Delay line to metrology system (INT-406-VEN-0010)RCB  
 ICD: Delay line to vacuum system (INT-406-VEN-0011)MF  
 ICD: Metrology System to BCF (INT-406-VEN-0012)RCB  
 ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)RCB  
FDR Overheads    
June 26, 2007, at 05:19 PM by 131.111.48.85 -
Changed line 24 from:
Requirements:   
to:
Requirements:   
Changed line 26 from:
Design Drawings:   
to:
Design Drawings:   
Changed line 30 from:
Design Documentation:   
to:
Design Documentation:   
Changed line 35 from:
Component Documentation:   
to:
Component Documentation:   
Changed line 37 from:
Handling Procedures:   
to:
Handling Procedures:   
Changed line 39 from:
Testing:   
to:
Testing:   
Changed line 43 from:
Risk and Hazard Assessment:   
to:
Risk and Hazard Assessment:   
Changed line 45 from:
to:
June 26, 2007, at 05:18 PM by 131.111.48.85 -
Changed line 19 from:
Management:   
to:
Management:   
Changed line 38 from:
to:
Nothing for FDR?   
June 26, 2007, at 05:16 PM by 131.111.48.85 -
Changed lines 42-54 from:
  • Risk and Hazard Assessment:
to:
Production trolley Acceptance Test Plan   
Risk and Hazard Assessment:   
Risk and Hazard documentMF  
Interface Control:   
ICD: Delay line to ICS (INT-406-ENG-0002)   
ICD: Delay line to Beam Relay system (INT-406-VEN-0008)   
ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)   
ICD: Delay line to metrology system (INT-406-VEN-0010)   
ICD: Delay line to vacuum system (INT-406-VEN-0011)   
ICD: Metrology System to BCF (INT-406-VEN-0012)   
ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)   
FDR Overheads   
June 26, 2007, at 05:14 PM by 131.111.48.85 -
Changed lines 35-37 from:
  • Component Documentation:
  • Handling Procedures:
to:
Component Documentation:   
Component Lists   
Handling Procedures:   
Changed lines 39-41 from:
  • Testing:
to:
Testing:   
List of tests: see DraftTestListDFB  
Test results document relating tests to derived requirementsMF  
June 26, 2007, at 05:13 PM by 131.111.48.85 -
Changed line 19 from:
Management:
to:
Management:   
Changed lines 23-24 from:
Requirements
to:
Production Phase Budgets?   
Requirements:   
Changed lines 26-30 from:
  • Design Drawings:
  • Design Documentation:
to:
Design Drawings:   
TrolleyXS  
Delay Line Pipes and SupportsXS  
Metrology Layout (for Magdalena Ridge)XS  
Design Documentation:   
June 26, 2007, at 04:54 PM by 131.111.48.85 -
Added lines 5-9:

The due date for each of the following documents should be one of the following:

  • 3 July - advance material for Part A of the review
  • 24 July - start of Part A of the review
  • [TBDPartB] - Part B of the review
Changed lines 11-14 from:
to:
DocumentResponsiblesDue DateStatus
Trolley concept description 3 JulyComplete
Software Functional DescriptionEBS/JSY  
Top-level Requirements INT-406-TSP-0002.pdfFS3 JulyRevisions needed
Changed lines 18-24 from:
to:
DocumentResponsiblesDue DateStatus
Management:
Schedule for delivery of 1st production trolley   
Schedule for Campus Acceptance Tests   
Contract Deliverables List? inc. Tables of Contents   
Requirements
Derived RequirementsDFB  
Changed lines 27-29 from:
  • Trolley
  • Delay Line Pipes and Supports
  • Metrology Layout (for Magdalena Ridge)
to:
Changed lines 31-34 from:
  • Trolley Mechanical Design Description [XS/DMAW]
  • Trolley Electronics Design Description [MF/RCB/EBS]
  • Metrology System & VME Design Description [RCB]
  • Delay Line Pipes and Supports [XS/DMAW/MF]
to:
Trolley Mechanical Design DescriptionXS/DMAW  
Trolley Electronics Design DescriptionMF/RCB/EBS  
Metrology System & VME Design DescriptionRCB  
Delay Line Pipes and SupportsXS/DMAW/MF  
Changed line 36 from:
  • Component Lists
to:
Changed line 38 from:
  • Nothing for FDR?
to:
Changed lines 40-42 from:
  • List of tests [DFB]: see DraftTestList
  • Test results document relating tests to derived requirements [MF]
  • Production trolley Acceptance Test Plan
to:
Changed line 44 from:
  • Risk and Hazard document
to:
Changed lines 46-54 from:
  • ICD: Delay line to ICS (INT-406-ENG-0002)
  • ICD: Delay line to Beam Relay system (INT-406-VEN-0008)
  • ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)
  • ICD: Delay line to metrology system (INT-406-VEN-0010)
  • ICD: Delay line to vacuum system (INT-406-VEN-0011)
  • ICD: Metrology System to BCF (INT-406-VEN-0012)
  • ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)
to:
June 18, 2007, at 09:41 AM by 131.111.48.85 -
Changed lines 3-4 from:

See also: FDRTodoLists

to:
Changed line 32 from:
  • List of tests [DFB]
to:
June 18, 2007, at 09:27 AM by 131.111.48.85 -
Added lines 3-4:

See also: FDRTodoLists

June 08, 2007, at 06:40 PM by 131.111.48.85 -
Changed lines 6-7 from:
  • Top-level Requirements (recent FS document)
to:
June 08, 2007, at 06:37 PM by 131.111.48.85 -
Changed line 42 from:
  • ICD: Delay line to Beam Relay System (INT-406-VEN-0013)
to:
  • ICD: Metrology System to Beam Relay System (INT-406-VEN-0013)
June 08, 2007, at 06:34 PM by 131.111.48.85 -
Changed line 32 from:
  • Acceptance Test Plan
to:
  • Production trolley Acceptance Test Plan
Changed lines 36-42 from:
  • XXX ICDs as per MF list
to:
  • ICD: Delay line to ICS (INT-406-ENG-0002)
  • ICD: Delay line to Beam Relay system (INT-406-VEN-0008)
  • ICD: Delay line to BCF infrastructure (building) (INT-406-VEN-0009)
  • ICD: Delay line to metrology system (INT-406-VEN-0010)
  • ICD: Delay line to vacuum system (INT-406-VEN-0011)
  • ICD: Metrology System to BCF (INT-406-VEN-0012)
  • ICD: Delay line to Beam Relay System (INT-406-VEN-0013)
June 08, 2007, at 06:16 PM by 131.111.48.85 -
Changed line 29 from:
  • Test Results:
to:
  • Testing:
Added line 32:
  • Acceptance Test Plan
June 08, 2007, at 06:14 PM by 131.111.48.85 -
Added lines 1-2:

The set of documents required for the July 2007 Final Design Review is based on MF's FDR Proposal Document.

June 08, 2007, at 03:00 PM by 131.111.48.85 -
Changed lines 8-20 from:
  • Requirements
    • Derived Requirements
  • Design Drawings
  • Design Documentation
  • Component Documentation
    • Component Lists
  • Handling Procedures
    • Nothing for FDR?
  • Test Results
  • Risk and Hazard Assessment
  • Interface Control
    • XXX list ICDs
to:
  • Requirements:
    • Derived Requirements [DFB]
  • Design Drawings:
    • Trolley
    • Delay Line Pipes and Supports
    • Metrology Layout (for Magdalena Ridge)
  • Design Documentation:
    • Trolley Mechanical Design Description [XS/DMAW]
    • Trolley Electronics Design Description [MF/RCB/EBS]
    • Metrology System & VME Design Description [RCB]
    • Delay Line Pipes and Supports [XS/DMAW/MF]
  • Component Documentation:
    • Component Lists
  • Handling Procedures:
    • Nothing for FDR?
  • Test Results:
    • List of tests [DFB]
    • Test results document relating tests to derived requirements [MF]
  • Risk and Hazard Assessment:
    • Risk and Hazard document
  • Interface Control:
    • XXX ICDs as per MF list
  • FDR Overheads
June 08, 2007, at 02:52 PM by 131.111.48.85 -
Changed lines 1-7 from:

Documents issued to reviewers "for information":

XXX

Documents for review:

XXX

to:

"For Information" FDR Documents

  • Trolley concept description
  • Software Functional Description [EBS/JSY]
  • Top-level Requirements (recent FS document)

FDR Documents for Review:

  • Management
  • Requirements
    • Derived Requirements
  • Design Drawings
  • Design Documentation
  • Component Documentation
    • Component Lists
  • Handling Procedures
    • Nothing for FDR?
  • Test Results
  • Risk and Hazard Assessment
  • Interface Control
    • XXX list ICDs
June 08, 2007, at 11:56 AM by 131.111.48.85 -
Added lines 1-7:

Documents issued to reviewers "for information":

XXX

Documents for review:

XXX