Production Software PDR To Do List

Main Wiki

Restricted Wiki

Local resources

PmWiki

pmwiki.org

edit SideBar

Production Software PDR To Do List

Documents

Requirement specifications for the MROI production delay line software
Updated for new ISS interface protocols
Production Delay Line Control Software Architecture
New document to be written (JSY)
Network Message Protocols and Telemetry/Status/Logs File Format
Describes protocols/FITS conventions common to prototype and production software. Need to update introduction, add extension for shearcam video (JSY)
Production Delay Line Software Compliance Matrix
New spreadsheet to be written (JSY)
Production Workstation Software Functional Description
New document to be written (JSY)
Production Metrology Software Functional Description
New document to be written (EBS)
Production Trolley Software Functional Description
To be written (EBS), based on Trolley Software Functional Description for DL FDR. Will mention functionality not in prototype software:
  • Lock preventing rtune from starting when alacarte running
    • Will this be in prototype software?
Production Shear Sensor Software Functional Description
To be written (EBS), based on Shear Camera Software Functional Description for DL FDR. Will highlight functionality not in prototype software:
  • Transmission of shearcam video to workstation using dlmsg extension (see protocols doc)
Delay Line Analysis GUI Description
To be written (MF), based on existing document
Production Delay Line Software Verification Plan
New document to be written (JSY) - draft only

Presentations

  • PDR slides
    • Relationship to prototype software
    • Software architecture
    • Internal message protocols (brief)
    • Workstation software
    • Metrology software
    • Trolley software
    • Shear camera software
    • Compliance matrix
    • Verification plan
    • Conclusions
Recent Changes (All) | Edit SideBar Page last modified on January 15, 2010, at 10:58 AM Edit Page | Page History
Powered by PmWiki